Pleasant Street Construction Update 6/19/2017

June 19, 2017 Construction Update

Pleasant Street Reconstruction Project

 

As of Friday June 16, 2017 the following work has occurred:

  • Repaired and lined the existing sewer.
  • Verizon installed new utility poles between Main Street and Cambridge Street.
  • Installed new 8-inch water main and services from Main Street to Groton Street.
  • Installed new drainage structures and pipe from Main Street to Groton Street.
  • National Grid installed a new gas main and services between Main Street and Groton Street.
  • Removed existing sidewalk and curbing.
  • Installed binder course pavement, asphalt berm, and adjusted castings.
  • Installed granite curbing and concrete sidewalks.

The following work is anticipated starting Monday June 19, 2017:

  • Remaining concrete driveway aprons and handicap ramps are being installed and walkway tie-ins completed.
  • Top course paving is schedule to occur later this week, on either Wednesday June 21st or Thursday June 22nd (weather permitting).

NO on-street parking will be allowed during construction. Local access will be allowed. Detours will be setup as necessary and detail officers will be onsite to direct traffic.

The Ayer DPW appreciates your cooperation during this important project. If you have any questions, please call the Ayer DPW at 978-772-8240 (7:30 to 3:30) or email DPW@ayer.ma.us